Indotech Plant

Client

Client

Indotech Industrial Corp

Indotech Industrial Corp
Year

Year

2021

2021
Duration

Duration

10 Weeks

10 Weeks
Location

Location

Surabaya

Surabaya

Challenge:

Indotech needed a 4,000m² industrial plant frame completed within a tight 10-week window to meet their production launch date.

Materials:

Heavy-gauge structural steel columns, industrial-grade roof trusses, crane rail support beams

Approach:

Our team fabricated the structural steel frame off-site in parallel with foundation work, cutting install time nearly in half. Full engineering validation was completed before any steel left the shop, so there were zero on-site redesigns.

Indotech Industrial Corp

"Reliable and fast. Their team provided us with complete solutions for our warehouse construction."