Our Projects
Indotech Plant

Challenge:
Indotech needed a 4,000m² industrial plant frame completed within a tight 10-week window to meet their production launch date.
Materials:
Heavy-gauge structural steel columns, industrial-grade roof trusses, crane rail support beams

Approach:
Our team fabricated the structural steel frame off-site in parallel with foundation work, cutting install time nearly in half. Full engineering validation was completed before any steel left the shop, so there were zero on-site redesigns.
Indotech Industrial Corp